Dormer cost: what does a dormer cost you in total?
Your dormer cost in one place. Enter the price in your quote, and the fee if you need a permit. You see the total, the VAT inside it and the grant that does not apply.
Your dormer, all costs together
The price is still needed
Enter the price in your quote: there is no official price list for dormers.
There is no official price list for dormers (dakkapellen), and Milieu Centraal, the government-funded energy advice centre, publishes no average. What a dormer costs depends on width, material, finish, window frames and the state of the roof. So this page works with the price in your own quote, not with a made-up amount per metre. Other items sometimes come on top: the council fee (leges) if you need a planning permit, a structural engineer if the roof frame must be altered, or scaffolding. Your council sets the fee in its fee bylaw; we give no amount for it. The quote price includes VAT: the standard rate of 21% for the dormer itself. The reduced rate of 9% covers, according to the Dutch Tax Administration, labour for fitting insulation to roofs of homes over 2 years old; for a new dormer as an extension that is not a given. A new dormer gets no ISDE grant: RVO excludes insulating added area, such as a new dormer. Check first whether you need a permit.
Site published by Radif Partners, independent: not an installer, not a government body, no commission. · Editorial policy · Method and sources
Everything explained: Dormer cost ›
What goes into the dormer cost
The calculator adds three things: the price in your quote including VAT, the fee if you need a permit, and other items you enter. It then works out how much VAT the quote contains at the 21% rate (Dutch Tax Administration, VAT rates).
Permit first
If your design fits the limits for permit-free building, you pay no fee. Check it on dormer without a permit. A few centimetres taller or closer to the ridge can make the difference between permit-free and an application (IPLO).
VAT and insulation
The Dutch Tax Administration applies the reduced rate to the labour for fitting insulation material to floors, walls and roofs of homes over 2 years old. If the contractor also insulates the existing roof, that part of the labour can fall under 9%, provided it is shown separately on the invoice. Ask about it when you get the quote.
No ISDE for the dormer
RVO excludes extensions from the ISDE insulation grant and names a new dormer explicitly (RVO – ISDE: insulation measures for home owners). The existing roof around it does get a grant if you have it insulated: €16.25 per m², from 20 m², with an Rd value of at least 3.5.