Facade insulation: outside or inside lining, and the net cost
Facade insulation without a cavity. Choose the method, enter the m² of facade and the price in your quote. You see the ISDE grant for facade insulation, the net price, the saving and the payback time.
Outside or inside: what does it cost net?
Choose the method
Choose to see your result.
A house without a cavity is insulated on the outside or on the inside with a lining wall (voorzetwand). Both get an ISDE grant of €20.25 per m², for 10 to 170 m², if the new material reaches an Rd value of at least 3.5; double that with a second measure within 24 months. Interior and party walls do not count as facade. Milieu Centraal, the government-funded energy advice centre, gives an end-of-terrace house with 88 m² of facade insulated outside a cost of €23,000 and 530 m³ less gas a year. An Rd 3.5 lining on 35 m² of outer wall in the living room costs €6,500 done by a company and saves 260 m³. Outside is dearer but covers the whole facade and keeps rooms the same size; the lining is cheaper per room and can be done step by step.
Site published by Radif Partners, independent: not an installer, not a government body, no commission. · Editorial policy · Method and sources
Everything explained: Facade insulation ›
Facade insulation outside, by type of house
| House | Cost | Grant | Net | Less gas | Per year |
|---|---|---|---|---|---|
| Terraced | €10,000 | €800 | €9,200 | 240 m³ | €320 |
| End-of-terrace | €23,000 | €1,750 | €21,250 | 530 m³ | €750 |
| Semi-detached | €24,000 | €1,850 | €22,150 | 550 m³ | €750 |
| Detached | €34,000 | €2,600 | €31,400 | 800 m³ | €1,100 |
Source: Milieu Centraal, external wall insulation (23 November 2026). Milieu Centraal assumes insulation boards finished with render or brick slips. Average facade area runs from 39 m² for a terraced house to 129 m² for a detached one.
Inside lining
For an end-of-terrace house Milieu Centraal gives €6,500 done by a company for insulation value Rd 3.5, with €700 in grant, and a saving of €360 a year (14 October 2026). A thinner Rd 2 lining gets no grant because it falls short of the ISDE requirement. The wall moves into the room: that costs floor space and needs care with moisture behind it.
How the calculator estimates the saving
Milieu Centraal gives the saving for an average end-of-terrace house. We divide it by that example’s area and multiply by your m². It is an approximation: orientation, windows and how you heat all make a difference.